Search

NewTrain

8 months

Australia (Sydney): New Trackless Tram

 ■ SERVICE – PROJECT
 o 2026: Commissioning
 25 km: Fifteenth Avenue Smart Transit (FAST)
 o New Airport (West) – Sydney (Liverpool CBD)
 o ~ 25 minutes: Travel time

 ■ ROLLING STOCK
 o 2020: Draft (Design)
 o Without Rail: Between Tram and Bus
 o Guidance: Optical + Cameras + GPS + Sensors +
 o Without Catenary: Electric
 • Batteries
 • Quick Recharge (Terminus)

 ■ COST
 o Construction: (P/P tram with Rail / Catenary)
 • Low cost
 • Reduced lead times
 o Maintenance: (P/P tram with Rail / Catenary)
 • Low Cost (Less Wear)
  No wear Iron wheel / Rail
  No Pantograph / Catenary wear
  Lighter
  Less Maintenance

 => Video of Liverpool City Council

■ NewTrain
#tram#Tramway#Sydney#fast#trackesstram#Transport#publictransport#Railway#ferroviaire#Trains#newtrain

Leave a Comment

Recent posts

Railway Engineering : Leaf Blasting Trains
Railway Engineering : Leaf Blasting Trains
■ How It Works ?
Spain (Train) : Rolling Stock Manufacturing
Spain (Talgo): Rolling Stock Manufacturing
■ Talgo
China (Shanghai Metro) : Rolling Stock Maintenance
China (Shanghai Metro) : Rolling Stock Maintenance
■ SERVICE

In the same category

Railway Engineering : Leaf Blasting Trains
Railway Engineering : Leaf Blasting Trains
■ How It Works ?
Spain (Train) : Rolling Stock Manufacturing
Spain (Talgo): Rolling Stock Manufacturing
■ Talgo
China (Shanghai Metro) : Rolling Stock Maintenance
China (Shanghai Metro) : Rolling Stock Maintenance
■ SERVICE

Get our last updates