■ SERVICE – PROJECT
● 2025: Launch of the Alto project –
Quebec – Toronto High Speed Train Line (Design Phase)
▪︎ Viola
● ~ 1000 km: 1 x High Speed Line (Toronto – Quebec)
● 7 x Stations served:
▪︎ Quebec
▪︎ Trois-Rivières
▪︎ Laval
▪︎ Montreal
▪︎Ottawa
▪︎ Peterborough
▪︎Toronto
● 300 km/h: Maximum speed
● 3 hours: Travel time (Quebec – Toronto)
● Owner: Canadian Crown Corporation Alto (Québec-Toronto high-speed train network) / Alto
● Project company and constructors: The international consortium “Cadence” (Design, Construction, Financing, Operation and Maintenance):
▪︎ CDPQ Infra (Caisse de dépôt et placement du Québec, Canada)
▪︎ AtkinsRéalis Group Inc. (formerly SNC-Lavalin, Canada)
▪︎ Air Canada (Canada)
▪︎ SYSTRA Canada / SYSTRA (France)
▪︎ Keolis Canada / Keolis Group / SNCF Group (France)
▪︎ SNCF Voyageurs / SNCF Group (France)
● Operator: Alto (Alto) in collaboration with the Cadence consortium
■ COST – INVESTMENT
● 3.9 billion Canadian dollars: Design phase (6 years)
=> Sources / Credits
▪︎ Radio Canada Info (Video)
▪︎ NewTrain : Post (Picture & Video Editing / Text)
=> Thanks for sharing by using “linkedin Post button “
🍀🚆🍀
■ NewTrain
www.newtrain.com
***
“Free Railway Contents & Informations “
=> Subscribe linkedin page : 👉 NewTrain
=> Follow (new post) : 👉 hashtag#newtrain
=> Check website : 👉 www.newtrain.com
■ NewTrain
#Canada #Alto #TGV #LGV #Quebec #Toronto #HSR #CDPQ #AtkinsRéalis
#AirCanada #SYSTRA #Keolis #SNCF #TrainGrandeVitesse #HighSpeedRail
#Ferroviaire #Railway #Rail
#PublicTransport #Transports #Train #Trains #NewTrain