■ PROJECT – SERVICE
o 2028: Commissioning (Line 1)
• 2023 (November): Start of Construction
o Metro on Overhead Railway (Automatic with Driver)
o 38 km: Line 1
o 20 x Stations
o 100 Seconds: Frequency
o 80 km/h: Max Speed
o 60,000 Passengers per hour: Capacity (Mass Transit)
o 530,000 Passengers per day (Estimate)
o Authority: Ministry of Transport (Côte d’Ivoire)
o Owner: Société de Transport Abidjanais sur Rail (STAR)
ABIDJAN METRO LINE 1
- Consortium: Bouygues Construction, Alstom, Colas Rail, Keolis Group (France)
o Operator: Keolis Group / SNCF Group (Operation & Maintenance)
■ ROLLING STOCK – SYSTEM
o 20 x Metropolis type trains:
- 5 x cars
- ~ 800 to 1000 Passengers: Capacity (Estimation)
- Max speed: 90 km/h (Design)
- Wifi + Heating + Air conditioning
- Manufacturer: Alstom (France)
o Signaling: CBTC type (Alstom)
o Power supply: 1500 V DC (catenary)
o Gauge (Rail): 1.435 m (Standard)
■ COST – INVESTMENT
o Financing: Loan / Concession (France)
o ~ €1.36 billion for 37 km (Air Metro)
- Infrastructure + Trains + System + Workshop +
o ~ €35.7 million per km
=> Sources / Credits :
▪︎ Ministère des Transports du Côte d’Ivoire
▪︎ NewTrain : Post (Picture & Video Editing / Text)
=> Thanks for sharing by using “linkedin Post button “
🍀🚆🍀
■ NewTrain
www.newtrain.com
***
“Free Railway Contents & Informations “
=> Subscribe linkedin page : 👉 NewTrain
=> Follow (new post) : 👉 hashtag#newtrain
=> Check website : 👉 www.newtrain.com
■ NewTrain
#metro #abidjan #train #star #keolis #ferroviaire #railway #Transport #cotedivoire #afrique
#africa #rail #publictransport #trains #newtrain