■ SERVICE
o Shinkansen = “New Intercity Line”
o 1964: commissioning (56 years: Olympic Games)
o 9 Lines / 2,765 km
o 320 km/h: Max speed
o ~ €121: Tokyo – Osaka (556 km, 2h48)
o 350 Million passengers per year (2015)
o 1 Million passengers per day
■ GENERAL OVERHAUL – GENERAL OVERHAUL
o Maintenance Level 4 + 5
o Frequency: 36 months (3 years) or 1.2 Million km
o Duration: 15 days (Train of 16 x cars)
o Operations (Main):
• Dismantling (Crate):
Removal: Bogies + Pantograph + Seats + Equipment +
• Equipment Overhaul:
Dismantling Parts + Cleaning + Control / Test + Repair +
• Body General Overhaul:
Repair + Painting
• Reassembly (Box):
Installation of revised Organs/Equipment
• Trials and Tests (+ washing)
■ ROLLING STOCK
o + 471 Trains: Max 16 Cars
• Manufacturer: Hitachi Rail (+ Other manufacturers)
• Series 500, 700, 800, N700, E2, E3, E4, E5, E6, E7
=> Video of NHK WORLD JAPAN
🍀🚆🍀
■ NewTrain
www.newtrain.com
***
“Free Railway Contents & Informations “
=> Subscribe linkedin page : 👉 NewTrain
=> Follow (new post) : 👉 #newtrain
=> Check website : 👉 www.newtrain.com
■ NewTrain
#train #maintenance #shinkansen #japan #japan #railway #railway #rail #Trains #newtrain