NewTrain

5 months

Japan (Utsunomiya LRT) : New Tramway Line

■ SERVICE
● 2023 : Commissioning Haga Utsunomiya LRT (Light Rail)
▪︎ Utsunomiya and Haga / Tochigi Prefecture, Japan
● 14.6 km : 1 x Line
▪︎  Track gauge : 1 067 mm
▪︎  Electrification :  750 V – DC

● 19 x Stations
●  70 km / h : Max Speed (Design)
▪︎ 40 mk / h : Operating speed
● 8 minutes: Max Frequency
● 16 000 Passengers per day
● Owner : Utsunomiya City and Haga Town
● Operator : Utsunomiya Light Rail Co., Ltd.

■ ROLLING STOCK – SYSTEM
● 17 x Light Rail (Tramways)
▪︎ Low-Floor Light Rail Vehicles
▪︎ 3 x Modules  / 30 m (Length)
▪︎ 160 Passengers : Capacity
▪︎ Manufacturer  : Niigata Transys (Japan)
● Track gauge : 1 067 mm
● Electrification :  750 V

■ COST – INVESTMENT
● $ 467 million for 14,6 km
▪︎  $ 32 million per km

Sources / Credit :
▪︎ NHK
▪︎ NewTrain : Post (Picture & Video Editing / Text)
=> Thanks for sharing by using “linkedin Post bottom”

🍀🚆🍀
NewTrain
www.newtrain.com
***
“Free Railway Contents & Informations “
=> Subscribe linkedin page : 👉 NewTrain
=> Follow (new post) : 👉 hashtag#newtrain
=> Check website : 👉 www.newtrain.com


NewTrain

 #Japan #LRT #Utsunomiya #Haga #Tram #Tramway #train #NiigataTransys 

#rail #japon #Railway #publicTransport #Transport #trains #newtrain

Leave a Comment

Recent posts

India (DFCCIL / Alstom ): New Freight Railway Corridor
India (DFCCIL / Alstom ): New Freight Railway Corridor
■ SERVICE
France (Grand Paris Express ) : Nouvelle Ligne Métro M18 – Métro Automatique
France (Grand Paris Express): New Metro Line M18 – Automatic Metro
■ SERVICE – PROJECT
Railway Engineering : Synchronized Train Lifting and Bogie Dismounting - CRRC
Railway Engineering : Synchronized Train Lifting and Bogie Dismounting
■ How It works ?

In the same category

India (DFCCIL / Alstom ): New Freight Railway Corridor
India (DFCCIL / Alstom ): New Freight Railway Corridor
■ SERVICE
France (Grand Paris Express ) : Nouvelle Ligne Métro M18 – Métro Automatique
France (Grand Paris Express): New Metro Line M18 – Automatic Metro
■ SERVICE – PROJECT
Railway Engineering : Synchronized Train Lifting and Bogie Dismounting - CRRC
Railway Engineering : Synchronized Train Lifting and Bogie Dismounting
■ How It works ?

Get our last updates