■ SERVICE
o 2018: commissioning (Mecca – Medina)
o 450 km: 1 x Line (Mecca – Jeddah – Medina)
o 5 x Stations
o 2h: Time
o 330 km/h: Max Speed (300 km/h: Operation)
o ~50 Million passengers per year
o Operator: PPP contract (12 years)
· Saudi Railway Company (SAR)
Renfe + Talgo (Spain)
· ADIF + others (Saudi Arabia)
■ ROLLING STOCK
o 35 x Talgo 350 SRO Trains
13 x Passenger Cars (+2 motor cars)
417 Passengers: Capacity (200 m)
350 km/h: Max Speed (Design)
Manufacturer: Talgo (Spain)
■ SYSTEM – INFRASTRUCTURE
o Signalling: ETCS 2
o Dual Lane: 1.435m
o Power supply: 25 kV AC – 50 Hz
■ COST – INVESTMENT
o ~ €7.1 billion for 450 km (PPP):
Infrastructure + Trains + Stations +
~ 15.7 Million € per km
o ~€1.257 billion: Rolling stock
35 x Trains (€35.9 million per train)
+ €343m (with maintenance)
o PPP: Public Private Partnership:
Design + Realization
Operation + Maintenance
Transfer
=> Sources / Credits :
▪︎ Renfe / Saudi Railway Company
▪︎ NewTrain : Post (Picture & Video Editing / Text)
=> Thanks for sharing by using “linkedin Post button “
🍀🚆🍀
■ NewTrain
www.newtrain.com
***
“Free Railway Contents & Informations “
=> Subscribe linkedin page : 👉 NewTrain
=> Follow (new post) : 👉 #newtrain
=> Check website : 👉 www.newtrain.com
■ NewTrain
#train#rail#railway#transport#saudiarabia#haramain#hsr#renfe#mecca#jeddah#medina#publictransport#trains#newtrain